tel: +44 (0)1275 858386
fax: +44 (0)1275 858387
Unit 36, Southfield Rd Trading Estate, Nailsea, Bristol, BS48 1JE, England
Adswood / Barlow Hall MSP's, StockportTwo methane stripping plants (1,000 m3/day) constructed in 2004 for Greater Manchester Waste Disposal Authority, which included operating the plants for one year. |
£300,000 |
|---|---|
Amberswood MSP, Wigan125 m3/day methane stripping plant - designed, constructed and commissioned by Hytech-Water in January 2003. |
£80,000 |
Ardley LTP, Oxford100/160 m3/day leachate treatment plant — Design & Build — included 2.2km of pipeline. |
£500,000 |
Arpley LTP, North WalesOur largest plant to date at 450 m3/day of very strong and heavily contaminated leachate. |
£750,000 |
Astley, Greater Manchester150 m3/day leachate treatment plant constructed on a design and build basis. |
£500,000 |
Attlebridge LTP, NorfolkA leachate treatment plant for Biffa Waste. Design & Build project including all Process Design, Civil's and MEICA works. Completed July 2004. |
£300,000 |
Beddington, South LondonForced Air Composting Plant, designed to handle 16,000 tonnes of waste per year. Full MEICA package including the design of the SCADA and all feedback control systems. Completed June 2004. |
£500,000 |
Brookhill LTP, North Wales160 m3/day leachate treatment plant where we acted as main contractor. |
£400,000 |
Deerdykes, CumbernauldForced Air Composting Plant, designed to handle 16,000 tonnes of waste per year. Full MEICA package including the design of the SCADA and all feedback control systems. Completed March 2006. |
£500,000 |
Drinkwater Park MSP, Greater Manchester250 m3/day methane stripping plant designed, constructed and commissioned by Hytech-Water during Autumn 2002. |
£120,000 |
Gremista, Shetland IslandsLeachate treatment plant to treat up to 200 m3/day. Completed in October 2005. |
£580,000 |
Guernsey, Channel IslandsMajor modification of existing leachate treatment plant. Hytech-Water acted as the main contractor during April 2003. |
£100,000 |
Kendal Fell, Cumbria50 m3/day methane stripping plant designed, constructed and commissioned by Hytech Water in Spring of 2000. |
£50,000 |
Midgeland Farm MSP, Blackpool1,800 m3/day methane stripping plant - built Spring 2005. |
£350,000 |
Pilsworth LTP, Bury400 m3/day leachate treatment plant incorporating diffused air and venturi continuous aeration. Designed and built Spring 2005. |
£470,000 |
Plank Lane MSP, Leigh250 m3/day methane stripping plant designed, constructed and commissioned by Hytech Water in February 2003. |
£80,000 |
Shelford LTP, Canterbury160 m3/day leachate treatment plant, which included an eductor-based raw leachate extraction system. We acted as the main contractor for the whole plant. |
£500,000 |
St Helens LTP, Lancashire80 m3/day leachate treatment plant built under a design and build package contract. |
£200,000 |