tel: +44 (0)1275 858386
fax: +44 (0)1275 858387

Unit 36, Southfield Rd Trading Estate, Nailsea, Bristol, BS48 1JE, England

sales@hytech-water.co.uk

Recent Projects (2000 - 2006)

Adswood / Barlow Hall MSP's, Stockport

Two methane stripping plants (1,000 m3/day) constructed in 2004 for Greater Manchester Waste Disposal Authority, which included operating the plants for one year.
£300,000

Amberswood MSP, Wigan

125 m3/day methane stripping plant - designed, constructed and commissioned by Hytech-Water in January 2003.
£80,000

Ardley LTP, Oxford

100/160 m3/day leachate treatment plant — Design & Build — included 2.2km of pipeline.
£500,000

Arpley LTP, North Wales

Our largest plant to date at 450 m3/day of very strong and heavily contaminated leachate.
£750,000

Astley, Greater Manchester

150 m3/day leachate treatment plant constructed on a design and build basis.
£500,000

Attlebridge LTP, Norfolk

A leachate treatment plant for Biffa Waste. Design & Build project including all Process Design, Civil's and MEICA works. Completed July 2004.
£300,000

Beddington, South London

Forced Air Composting Plant, designed to handle 16,000 tonnes of waste per year. Full MEICA package including the design of the SCADA and all feedback control systems. Completed June 2004.
£500,000

Brookhill LTP, North Wales

160 m3/day leachate treatment plant where we acted as main contractor.
£400,000

Deerdykes, Cumbernauld

Forced Air Composting Plant, designed to handle 16,000 tonnes of waste per year. Full MEICA package including the design of the SCADA and all feedback control systems. Completed March 2006.
£500,000

Drinkwater Park MSP, Greater Manchester

250 m3/day methane stripping plant designed, constructed and commissioned by Hytech-Water during Autumn 2002.
£120,000

Gremista, Shetland Islands

Leachate treatment plant to treat up to 200 m3/day. Completed in October 2005.
£580,000

Guernsey, Channel Islands

Major modification of existing leachate treatment plant. Hytech-Water acted as the main contractor during April 2003.
£100,000

Kendal Fell, Cumbria

50 m3/day methane stripping plant designed, constructed and commissioned by Hytech Water in Spring of 2000.
£50,000

Midgeland Farm MSP, Blackpool

1,800 m3/day methane stripping plant - built Spring 2005.
£350,000

Pilsworth LTP, Bury

400 m3/day leachate treatment plant incorporating diffused air and venturi continuous aeration. Designed and built Spring 2005.
£470,000

Plank Lane MSP, Leigh

250 m3/day methane stripping plant designed, constructed and commissioned by Hytech Water in February 2003.
£80,000

Shelford LTP, Canterbury

160 m3/day leachate treatment plant, which included an eductor-based raw leachate extraction system. We acted as the main contractor for the whole plant.
£500,000

St Helens LTP, Lancashire

80 m3/day leachate treatment plant built under a design and build package contract.
£200,000